AI-Powered Middle Mile Control Tower

Every truck.
Every degree.
Under control.

ShippriQ is the operating system for middle mile logistics — live GPS tracking, cold-chain compliance, and exception management for reefer and dry fleets, across every e-commerce and quick-commerce project you run.

10K+Vehicles tracked
200M+Deliveries monitored
99.5%Platform uptime
24/7Ops support
app.shippriq.com/control-tower LIVE
ShippriQ Project Control Tower dashboard showing vehicles scheduled, temperature compliance, and operational exceptions
LIVE TELEMETRY
Powerful Capabilities

Everything you need to run a perfect operation

One control tower for every truck, every temperature, every project — from dispatch to delivery.

Real-time Tracking

Live vehicle tracking with multi-GPS provider integration and intelligent location updates.

Learn more →

Temperature Intelligence

Continuous reefer temperature monitoring with alerts, compliance tracking, and breach reporting.

Learn more →

Project Management

Manage multiple projects, customers, and lanes from a single unified control tower.

Learn more →

Exception Management

AI-powered exception detection and automated escalations for faster resolution.

Learn more →

Analytics & Insights

Actionable dashboards and reports to optimize performance and reduce costs.

Learn more →
Built For Complex Operations

Visibility that drives performance

Five views into one live fleet — pick a screen to see it in action.

Stoppage Monitoring

Know every unplanned stop, every time.

Automatic detection flags any vehicle idling past its threshold — no dispatcher watching a map required.

  • Automatic stop detection
  • Duration and reason capture
  • Configurable threshold alerts
  • Quick resolution tracking
See it in action →
ShippriQ Stoppages screen listing unplanned vehicle stops with duration and status
Entry/Exit Data

Full dwell history at every registered location.

See exactly when a truck entered a hub, dark store, or customer dock — and what the reefer read the whole time it was there.

  • Geofenced location detection
  • Entry, exit and dwell duration
  • Temperature range for the visit
  • Filter by vehicle, project or site
See it in action →
ShippriQ Entry/Exit Data screen showing vehicle dwell history at registered locations
Reefer Status

Cold chain, watched in real time.

Live telemetry per vehicle — location, motion, temperature and battery — polled continuously across every reefer vendor you run.

  • Per-vehicle temperature and battery
  • Custom threshold alerts
  • Sensor and power-loss flags
  • Works across GPS vendors
See it in action →
ShippriQ Reefer Status screen showing live temperature, battery and motion telemetry per vehicle
Live Map

Every truck and every hub, on one map.

Last known position for the whole fleet, plus saved delivery and pickup locations — filterable by project or city.

  • Fleet-wide live positions
  • Saved hubs and delivery points
  • Filter by vehicle, project or city
  • One-click refresh, always current
See it in action →
ShippriQ Live Map screen showing fleet vehicle positions and saved locations across Bengaluru
Control Tower

One screen, the whole project.

Vehicles scheduled versus dispatched, temperature compliance, and every operational exception — rolled up per project, updated live.

  • Scheduled vs. dispatched at a glance
  • Delivery-point temperature compliance
  • Exceptions, ranked and drillable
  • One view per customer, per project
See it in action →
ShippriQ Project Control Tower screen showing temperature compliance and operational exceptions
Trusted By Industry Leaders

Powering the middle mile for e-commerce and quick commerce fleets

50+ e-commerce and quick-commerce operators run their reefer and dry fleets on ShippriQ.

Seamless Integrations

Works with your existing stack

ShippriQ plugs into the GPS providers, TMS and ERP systems you already run — no rip and replace.

View all integrations →
GPS Providers

Any tracking vendor

WheelsEye, Geotab, TrackX and 50+ more, unified into one feed.

TMS Systems

Your dispatch tools

Sync trips and lanes from the TMS your ops team already uses.

ERP Integration

SAP, Oracle, NetSuite

Reconcile deliveries and exceptions against your ERP of record.

API First

Build on ShippriQ

REST APIs and webhooks for custom dashboards and alerts.

Ready to run a perfect middle mile?

Join the operators using ShippriQ to keep every truck on time and every degree in range.